
<http://10.240.6.139:8984/fcrepo/rest/prod/24/5a/88/a8/245a88a8-8aff-4950-b32c-35b19de88107> <http://purl.org/dc/terms/title> "Building the first 330,000 volt transmission line. ";
   <http://lib.wvu.edu/hydra/creatorCorpNames> "Appalachian Electric Power Company.";
   <http://lib.wvu.edu/hydra/hasMedia> "No Digital Content";
   <http://lib.wvu.edu/hydra/subjectTopical> "Electric lines--Appalachian Region.";
   <http://purl.org/dc/terms/creator> "Appalachian Electric Power Company.";
   <http://purl.org/dc/terms/date> "undated";
   <http://purl.org/dc/terms/description> "Pamphlet. A pictorial history of the research and construction of the first portion of a super-high-voltage transmission system, \"extending from the Philip Sporn 600,000-kilowatt steam-electric generating plant to the 400,000-kilowatt steam-electric plant known as the Kanawha River Plant.  Includes map.  ";
   <http://purl.org/dc/terms/format> "";
   <http://purl.org/dc/terms/identifier> "P1975";
   <http://purl.org/dc/terms/isPartOf> "pec";
   <http://purl.org/dc/terms/subject> "Electric lines--Appalachian Region.";
   <http://purl.org/dc/terms/type> "14256";
   <http://www.w3.org/ns/auth/acl#accessControl> <http://10.240.6.139:8984/fcrepo/rest/prod/76/78/68/6d/7678686d-bc48-4540-a869-301fceac5dcc> .
